Written scope
Flat price before demo starts
Shower installation in Houston is the work of a valve, a drain and a pan connection, not just a head and a handle. A new shower is a valve, a drain and a pan connection, not just a head and a handle. El Primo Lalo Plumbing installs showers in Houston with the valve set right, the drain connected properly, and the pan tested, so the floor underneath stays dry.
Every shower installation Houston TX job we quote covers the plumbing work that makes the shower safe and serviceable. Finish tile and cosmetic wall repair are quoted separately when needed, and we tell you that up front so the scope is clear.


We replace leaking pans, failed liners and weak valves in houses across Houston. You get a written estimate before demo and a shower that drains and holds.
We install and replace shower units in rental units, gyms and small hotels. Work is scheduled around your operating hours so you do not lose a day.
A shower install has three connections that all have to be right: the valve, the drain and the pan. The valve controls temperature and flow, the drain has to be vented and sloped, and the pan has to hold water without leaking into the subfloor. A failure in any one of them shows up as a drip, a slow drain or water on the floor outside the shower.
Bath remodels drive most shower installs in Houston, especially in older homes in the Heights, Montrose and River Oaks. In slab homes, the drain and pan work can mean concrete work, so we check the existing connections before the new shower arrives. Hard water makes a serviceable cartridge worth choosing at install time.
Valve, drain, pan. Get all three right and the shower is done for years.
Every job follows the same five steps, whether it is a one-day swap or a full shower remodel plumbing Houston project. You know what happens each day and who is in your house.

Clean cuts and press connections on copper pipe and PEX tubing without open flame where the wall is tight. Faster and safer inside a finished bathroom.

Sweated copper connections where the code and the space call for them. We use a heat shield to protect framing and nearby finishes.

We scope the drain line before tying in a new shower drain, so a root intrusion in sewer line or a collapsed section is found before the pan goes down.

Finds water behind the wall or under the slab when the leak is not obvious. Saves opening the wrong wall on a shower replacement Houston TX job.

Clears the shower branch line and the main drain before the new pan is set, so the shower starts with a clear drain.

Sets the valve at the correct depth for the finish wall and checks the pan slope. The difference between a trim that fits flush and one that does not.

Valve height, drain size and pan slope are set to code as adopted in Houston. We check the work against the code before the wall closes, not after the inspector arrives.

For tile showers, the pan liner is filled with water and left overnight before any tile goes up. If it holds, the shower is watertight. If it does not, we fix it now.
We remove the tub, relocate the drain as needed, set a low-threshold pan and add blocking for grab bars. The valve is replaced with a pressure-balance unit set to a safe temperature. A step-in shower with a curb under 4 inches, grab bar backing in place and steady water temperature, finished in four working days.
We treat it as priority work, stop the water when we arrive, and schedule the pan and valve replacement within the week. The permit is pulled and the inspector meets us on site. The leak stops, the ceiling below dries out, and the unit is back in service without a second trip for paperwork.
We scope the drain line with a sewer camera, replace the failing section, rough in the new valve and drain, and flood-test the pan before the tile setter starts. A tile shower on a sound drain line, with the plumbing inspected and signed off before the finish goes up.
We test pressure at the valve and find galvanized pipe feeding the shower. We replace that run with PEX tubing and install a new pressure-balance valve. Full pressure at the head and steady temperature, fixed at the source instead of with a gimmick shower head.
Bath remodels in the Heights, Montrose and River Oaks drive most installs, while Sharpstown and Meyerland bring slab-home drain and pan work. Hard water makes the cartridge choice matter.
A 1990s fiberglass shower in a Clear Lake home had a cracked pan leaking into the ceiling below. The valve was a corroded two-handle unit with weak, uneven pressure.
We removed the old unit, replaced the drain connection, set a new low-threshold pan in mortar and installed a pressure-balance valve. The ceiling below stayed dry through a 10-minute test run.
Wipe the pan dry after use and check the caulk line at the drain twice a year. A water softener will keep the new valve cartridge clean.
A 1970s tile shower in the Heights had a failed pan liner. The tile looked intact but the mud bed stayed wet and the dining room ceiling was stained.
We tore out the mud bed and liner, replaced the drain and subfloor section, rebuilt the pan and flood-tested it overnight. New tile went up on a pan that held water.
Reseal the grout and caulk annually, and keep the weep holes at the drain clear so water does not sit in the pan.
A Bellaire homeowner needed a step-in shower for a parent recovering from surgery. The existing tub-shower combo had a 15-inch tub wall and no grab bar backing.
We removed the tub, relocated the drain, set a low-curb pan and added blocking for grab bars. The valve was replaced and set to a safe maximum temperature.
Check the grab bar screws every six months and keep the curb caulk sealed. The low curb stays easy to step over for years.
Most shower failures start behind the wall and show up on the ceiling below. These are the problems we find on Houston shower replacement calls and how we stop them.

We remove the old pan, inspect the subfloor and drain line, and set a new base in mortar so it does not flex. The drain connection is checked with a level and the shower is run for several minutes before we leave. Water reaches the subfloor and the ceiling below for weeks before it shows. By then the drywall, insulation and sometimes the joists are wet, and mold has a foothold.

We tear out the old mud bed and liner, check the drain and subfloor, and rebuild with a new liner and a flood test. No tile goes up until the pan holds water overnight. A tile shower with a failed liner leaks slowly and constantly. The tile looks fine while the mud bed stays wet, and the damage spreads under the floor.

We install a pressure-balance or thermostatic valve and flush the line. If the supply is galvanized pipe, we replace that section with copper pipe or PEX tubing so the new valve gets full flow. Old two-handle valves and clogged cartridge screens make the shower weak and unpredictable. A sudden toilet flush can send the temperature from comfortable to scalding.

We set the new drain level and centered, check the slope with a level, and confirm the pan drains fully before the job is closed out. Water puddles in the pan and never fully drains. Over time the standing water stains the base and works at the caulk line.
A cracked pan or failed liner sends water into the subfloor and the ceiling below for months before you see it. We pressure-test the new pan and check the drain connection before the walls go up, so a shower replacement Houston TX job ends the leak instead of hiding it.
Old two-handle valves and clogged cartridge screens cause scald swings and weak spray. We install a pressure-balance or thermostatic valve set to the correct depth, then flush the line and confirm flow at the head. Most customers notice stronger, steadier water the same day.
A walk in shower installation Houston Texas project removes the 15-inch tub wall that makes stepping in risky. We set a low-threshold base, add blocking for grab bars, and keep the curb under 4 inches where the drain allows, which matters for aging parents and anyone recovering from surgery.
A dated, leaking shower is one of the first things a Houston buyer's inspector flags. A clean new pan, code-correct valve and properly sloped drain give you a documented upgrade, and we leave the shutoff valves and supply lines accessible so the next plumber can service them.
Clear records you can keep and share.
Flat price before demo starts
Pan held water overnight
Inspector approval on file
A shower is a plumbing fixture before it is a tile job. The valve depth and the drain slope decide whether it works, and neither is visible after the finish goes up.
The valve body must sit at the depth of the finish wall. Set too deep, the trim will not seal. Set too shallow, the handle will not sit flush.
The pan must slope to the drain so water does not puddle. We check it with a level before the pan is set and confirm it drains fully.
The drain line under the shower is often cast iron pipe in older Houston homes. We scope it before tying in a new drain so a failing line is not covered up.

Outside these areas? Call and ask if we can reach you. (346) 776-8560
A plumber should install a shower. The work involves the valve, the drain and the pan connection, and a bad seal leaks into the wall or subfloor where nobody sees it until the damage is done.
A straightforward swap is usually a short visit. A full remodel with new valve, drain and pan work takes longer, especially in slab homes. We give you a written scope before we start.
The pan is the waterproof base under the shower floor. If it fails, water leaks into the subfloor and framing. Testing the pan is part of every install we do.
Yes. Estimates are free, and you approve the written scope before work starts. We are open Monday to Sunday, 7:00 AM to 10:00 PM.
Call (346) 776-8560 for a free estimate. We set the valve, connect the drain and pan, and test the shower before we leave, Monday to Sunday, 7:00 AM to 10:00 PM.
Call us at (346) 776-8560 to book shower installation or ask a question. We are open Monday to Sunday, 7:00 AM to 10:00 PM, and estimates are free.
The fastest way to book is a phone call. Tell us what is happening and we will give you a free estimate and a time that works, Monday to Sunday, 7:00 AM to 10:00 PM.
Open Mon–Sun, 7:00 AM–10:00 PM. Free estimates.